Globaltec’s energy segment comprised of oil & gas exploration, production and services expertise. The Group is primarily focus on the development of coalbed methane (“CBM”) exploration & production in Indonesia.
The Group has a 65% interest in NuEnergy Gas Ltd ("NuEnergy"), a company listed on the Australian Securities Exchange (“ASX”). NuEnergy has a total of four (4) coalbed methane (CBM) production sharing contracts (“PSC”) in Indonesia, summarised as below:
Working Area | Muara Enim | Muara Enim II | Tanjung Enim | Muralim |
---|---|---|---|---|
Date of PSC Signed | 30th November 2009 | 1st April 2011 | 4th August 2009 | 3rd December 2010 |
Date of PSC Expiry | 29th November 2039 | 31st March 2041 | 3rd August 2039 | 2nd December 2040 |
Participating Interest | 40% (operator) | 30% (operator) | 45% (operator) | 50% (operator) |
Participating Interest | 40% (operator) | 30% (operator) | 45% (operator) | 50% (operator) |
Co - Ventures | 60% - Pertamina | 40% - Pertamina 30% - Sugico |
27.5% - Pertamina 27.5% - Bukit Asam |
50% - Medco |
Original Acreage | 652.60 km² | 1,170.86 km² | 312.7 km² | 982.7 km² |
Current Acreage | 521.84 km² | 819.5 km² | 249.1 km² | 687.9 km² |
Resources | ||||
|
3,056 BCF | 4,715 BCF | 0.4 TCF | 1.4 TCF |
|
658 BCF | 766 BCF | 0.1 TCF | 0.7 TCF |
|
1C - 0.8 BCF 2C - 0.8 BCF 3C - 39 BCF |
- | 1C - 0.1 TCF 2C - 0.1 TCF 3C - 0.2 TCF |
- |
Notes to all resource estimates in this table:
1
The estimated quantities of petroleum that may potentially be recovered by the application for a future development project(s) relate to undiscovered
accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation
is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.
2
Estimated using probabilistic methods.
3
Reported as 100% net to the Company.
4
Classified and reported in accordance with guidelines set forth by the Society of Petroleum Engineers – Petroleum Resource Management System (SPE-PRMS).
5
Unadjusted for risk.
For more information, kindly visit nuenergygas.com